This is now perhaps the slowest period of the build to date! However, there are now plenty of bits on order that should be arriving some time next week:
- Accusump and Oil Stat Brackets
- Fuel Pump
- Fuel Filter and Pump Pre-Filter
- Fuel Pressure Gauge for Fuel Regulator
- Carb inlet fitting
- Braided Hose for fuel supply and assorted fittings
- Braided Hoses and assorted fittings to complete Accusump connection
- Clutch Slave Bracket (Getting Beyond a Joke now - but promised for next week!!)
So the plan would be:
- Replace Clutch Slave Bracket - fit slave hose.
- Finish the exhaust system.
- Fit Oil Stat, Accusump and associated plumbing.
- Install fuel supply to carb in engine bay.
This means we are now getting closer to engine start up! to get to this point I will need to do the following:
- Rig up a temporary fuel pump and filter arrangement.
- Rig up a temporary electrical system and dashboard - this means I'll need to order my gauges and senders - although I'll only be using the Rev Counter, Oil Pressure & Water Temperature initially.
The aim is to get the engine running, and the cam broken, before mid November - as this is when the body has been ordered for!!
0 Comments:
Post a Comment